Buying a home in India runs in a fixed order: fix a budget you can service, choose between under-construction and ready possession, check the builder's delivery record, verify the project's title and approvals, read the carpet area rather than the headline area, inspect the build, negotiate, sign a registered agreement, register the sale deed, and inspect again at handover.
Key facts
- The Real Estate (Regulation and Development) Act 2016 requires a project above its state's threshold to be registered with the state authority before it is advertised or sold.
- Under RERA, flats must be sold and advertised on carpet area, not super built-up area.
- Section 2(k) of RERA defines carpet area as net usable floor area, excluding external walls, areas under service shafts, exclusive balcony and exclusive open terrace, but including internal partition walls.
- An occupancy certificate is issued by the local authority, not the builder, and says the building may lawfully be occupied.
- Registration of a sale deed is compulsory under the Registration Act 1908. An unregistered sale deed does not transfer title.
- Floor area ratio and floor space index are set by the local development authority, not the developer.
- Stamp duty is a state charge. Confirm the current figure with your state's registration department.
- Loading, the gap between carpet area and the area you are charged for, is the most useful single number for comparing two quotes.
How much home can I actually afford?
Start with the monthly outgo, not the property price. Lenders will often sanction more than is comfortable, because their test is whether you can pay, not whether you can still live. Work out what you can set aside every month without touching your emergency fund, work backwards to a loan amount, then add your down payment to get a price ceiling. Our EMI calculator does that either way round.
The number that catches first-time buyers is the money needed on top of the flat price. Stamp duty, registration, GST on an under-construction purchase, parking, clubhouse charges, the maintenance advance and the corpus fund sit outside the quoted price, and are almost always payable in cash rather than from the loan. We have worked through every one in what buying a home really costs.
Interest rates move, so do not plan around today's rate. Plan around a rate meaningfully higher than the one you are quoted and check the EMI still works. Floating-rate loans are linked to an external benchmark, and when that benchmark rises most lenders extend the tenure rather than raise the EMI, which quietly adds years of interest.
Should I buy under construction or ready to move?
This is the first real fork, and it is a trade between price and certainty. An under-construction flat is usually priced lower and is paid for in instalments as the building rises. A ready flat costs more and gives you a thing you can stand inside: the actual light in the living room, the actual noise from the road.
What matters most is not price but what happens if things go wrong. With a ready flat the construction risk has already been taken by someone else. With an under-construction flat you are lending the developer money against a promise, and if the project stalls you pay EMI on a disbursed loan while also paying rent. That double outgo, rather than the headline discount, decides the real cost.
| Factor | Under construction | Ready to move |
|---|---|---|
| Price | Usually lower, lowest at launch | Higher, because the risk is gone |
| Payment | Staged against construction milestones | Largely on registration |
| GST | Applies to an under-construction unit | Not charged on a completed unit holding its occupancy certificate |
| What you can inspect | A show flat, a sample, drawings | The actual flat, light, ventilation, finish |
| Delay risk | Carried by you; RERA gives a remedy, not time back | None |
| Rent while waiting | Paid alongside part EMI | Stops at possession |
| Choice of unit | Wide: floor, facing, tower | Whatever is unsold |
| Neighbours, common areas | Unknown, promised in a brochure | Visible, built or visibly not built |
A new launch sits at the far end of that scale: lowest price, longest wait, least to inspect. A resale flat in a completed society sits at the other end and brings its own work, because you inherit one owner's paperwork rather than a developer's standard set. For a resale, ask for the chain of title, the society's no-dues certificate and proof that tax and maintenance are paid up. On whether to wait for prices to fall: nobody reliably times a property market, and waiting costs rent.
How do I check whether a builder can be trusted?
The developer's record is the part of the purchase you can research most cheaply and most people skip. Start with delivery history rather than brand. Ask for a list of completed projects, then go and look at two that were handed over three to five years ago. A building at that age tells the truth about the construction: seepage on external walls, cracked plaster at junctions, lifts already replaced, a clubhouse promised and never finished.
Talk to residents, not the sales office. Ask three things: how late was handover against what the agreement said, what differed between the sample flat and the delivered flat, and how long the developer stayed engaged after possession. The third matters most, because handover of common areas and formation of the owners' association is where many otherwise decent projects go sour.
Then check the formal record. The state RERA portal lists a registered project's promoter, declared completion date, approvals and quarterly progress updates, and it lists complaints and orders against the promoter. That complaint record is the most honest thing you will read about any developer. Our RERA lookup points you at the right state portal, and the RERA guide explains each field. Ask too how many units are sold: a project funded largely by customer advances, selling slowly, is more exposed to a stall.
Which approvals and documents should I verify?
Verification runs in two halves. The first is the land: does the developer have the right to sell this, free of claims. The second is the building: is it permitted, and is the permission for what is actually being built.
For the land, work back through the chain of ownership. The mother deed, or parent document, is the earliest document in the chain, and later deeds should trace cleanly from it with no unexplained gap. An encumbrance certificate, obtained from the sub-registrar for a stated period, lists registered transactions on the property, which is how you find a mortgage nobody mentioned. In Karnataka, the khata records the municipal entry for property tax, and its category affects both tax and loan eligibility. Land records for most states are online, and our state-by-state guide shows where to look.
For the building, the commencement certificate shows construction was permitted to start, the sanctioned plan shows what was permitted, and the occupancy certificate shows the completed building may lawfully be occupied. Compare the sanctioned plan with what is standing. An extra floor, a tower closer to the boundary than the plan shows, or a clubhouse on land marked as open space are deviations, and deviations are the usual reason an occupancy certificate is delayed or refused.
| Stage | What to collect | Source | What it tells you |
|---|---|---|---|
| Shortlisting | RERA registration number and project page | State RERA portal | The project is registered; declared completion date |
| Before paying | Title deed and the chain of earlier deeds | Developer, read by your lawyer | Whether the seller can sell |
| Before paying | Mother deed or parent document | Developer or sub-registrar | Origin of the title chain |
| Before paying | Encumbrance certificate | Sub-registrar | Registered mortgages and charges |
| Before paying | Sanctioned plan and commencement certificate | Developer, cross-checked with the authority | What was permitted to be built |
| Booking | Allotment letter: unit, carpet area, full price | Developer | What you have actually booked |
| Agreement | Registered agreement for sale, payment schedule, possession date | Sub-registrar | Your enforceable rights |
| Before final payment | Occupancy certificate | Local authority, via the developer | The building may lawfully be occupied |
| Registration | Registered sale deed and duty receipts | Sub-registrar | Title has transferred to you |
| Handover | Possession letter, snag list, warranties | Developer and utilities | The flat and its services are yours |
Have a property lawyer read the title, and pay for it. The lawyer is looking for what you are not trained to see: an unreleased mortgage, agricultural land never properly converted, a family member whose consent was required and not taken. A lender's legal opinion protects the lender's security, not your possession. Our documents checklist lists the full set.
What does carpet area mean, and how do I read the loading?
Three area figures circulate and only one is the floor you can walk on. Carpet area is the net usable floor area of the flat. Section 2(k) of RERA defines it as excluding the area covered by external walls, areas under service shafts, exclusive balcony and exclusive open terrace, while including internal partition walls. Built-up area adds the thickness of the external walls and, as commonly quoted, the balcony. Super built-up area adds your share of lobbies, staircases, lift wells, corridors and often the clubhouse.
RERA requires sale and advertising on carpet area, and most price sheets now show it. Many still quote the rate per square foot on super built-up area, which is why two quotes can look comparable and not be. The gap between the two is the loading.
| Figure | Flat A | Flat B |
|---|---|---|
| Carpet area | 1,000 sq ft | 1,000 sq ft |
| Built-up area | 1,180 sq ft | 1,150 sq ft |
| Super built-up area, the area charged | 1,450 sq ft | 1,320 sq ft |
| Loading on carpet area | 45.0 per cent | 32.0 per cent |
| Loading on built-up area | 22.9 per cent | 14.8 per cent |
| Quoted rate on super built-up | Rs 6,000 per sq ft | Rs 6,400 per sq ft |
| Base price | Rs 87,00,000 | Rs 84,48,000 |
| Effective rate per sq ft of carpet | Rs 8,700 | Rs 8,448 |
Flat A looks cheaper and is not. Its headline rate is four hundred rupees lower, but it loads forty-five per cent onto the carpet area against Flat B's thirty-two, so you pay more for less usable space. The sum is simple: loading on carpet equals super built-up minus carpet, divided by carpet. Builders compute it on different bases, so ask which base a quoted percentage uses, or do the division yourself.
High loading is not automatically bad. A project with wide corridors, a real clubhouse and two staircases per core loads more than a bare-bones building, and you may want those things. What is bad is paying for it without knowing. Get the carpet area written into the allotment letter and the agreement.
What are FAR and FSI, and how do I read a project's density?
Floor area ratio and floor space index are two names for the same regulatory idea: how much floor may be built on a plot, expressed as a multiple of the plot area. A plot of 1,000 square metres with a permitted ratio of 2.0 may carry 2,000 square metres of built floor. It is set by the local development authority through the master plan and building rules, and varies by city, by zone and often by the width of the abutting road. Some states regulate mainly through height, setbacks and open space rather than a hard cap, so do not assume a national number.
| Term | What it measures | Who sets it | What to ask the developer |
|---|---|---|---|
| FAR or FSI | Permitted built floor area as a multiple of plot area | Local development authority, via master plan and building rules | The permitted ratio for this plot and the ratio actually consumed |
| Ground coverage | Share of the plot the building may sit on at ground level | Building rules | How much open ground is left between towers |
| Setback | Minimum distance from the plot boundary | Building rules, often tied to height | Distance between your tower and the next |
| Premium or purchasable FSI | Extra ratio bought from the authority where rules allow | State or city policy | Whether it was used, paid for and approved |
| Density | Dwelling units per unit of land | Master plan, in some cities | Total units on the parcel |
You can sanity-check a project's claims with this. Take the land area from the RERA page, convert it to the unit the permitted ratio uses, and multiply. One acre is 4,046.86 square metres, so a two-acre parcel is about 8,094 square metres. At a permitted ratio of 3.0 that parcel supports roughly 24,280 square metres of built floor, and if an average unit is about 110 square metres of built-up area you arrive near 220 flats. Treat that as a ceiling, not a forecast, because common areas and services consume part of the permitted floor. A brochure number far above your ceiling means the land area, the ratio or the unit count is wrong.
How do I judge construction quality?
You will not get a structural audit, but you can check a great deal yourself, and the principle is that finish hides defects while water finds them. In a ready flat, carry a measuring tape, a level app, a torch and a marble. Roll the marble to find a slope. Shine the torch along a wall at a shallow angle to see the undulations the paint hides. Tap the tiles and listen for the hollow note that means poor bedding. Run every tap and shower together, and pour a bucket on the bathroom floor to see whether the water reaches the drain. Latch and lock every door and window. Count the electrical points against the agreement. Inspect the corners where external walls meet the ceiling, ideally after rain, where stains and salt deposits give seepage away. Then walk the lobby, staircase, basement and terrace.
In an under-construction project, ask to see the structure before the plaster goes on, because that is the only time the real work is visible. Ask which grade of concrete and reinforcement steel the structural design calls for, ask for the concrete cube test reports, and ask whether the building is designed for its seismic zone. A clean site, where materials are stacked and covered and workers wear harnesses, usually means real supervision.
Mivan versus conventional RCC, honestly
Conventional reinforced cement concrete construction puts up a frame of columns and beams, fills the walls with blocks or bricks, then plasters them. Aluminium formwork construction, which most Indian buyers know by the brand name Mivan, casts the walls and slab together as a single concrete shell using reusable moulds. The walls themselves are structural, with no separate block wall and no thick plaster.
The advantages are real. Cycle times are much shorter because one mould set is reused floor after floor. Surfaces come off the mould flat and true, so you see fewer undulating walls, and there are fewer joints between dissimilar materials, which is where water usually gets in.
The trade-offs are equally real and sales teams rarely raise them. Because the walls are structural concrete, you cannot casually knock one through later to merge two rooms, and cutting new chases for wiring or plumbing into a cast wall is restricted and sometimes not permitted at all. Everything has to be planned before the pour: conduits, boxes, sleeves, every socket. Thin concrete walls also behave differently from a cavity block wall in heat and in sound, so ask what the external wall build-up is. And the system only pays for repeating floor plates, which is why such towers often offer less layout variety. Neither method is better in the abstract: a well-supervised conventional building beats a badly supervised formwork one.
Is a green rated building worth paying for?
Green certification is awarded by rating bodies rather than by government. IGBC ratings are run by the Indian Green Building Council, part of the Confederation of Indian Industry. LEED is run by the US Green Building Council. GRIHA is the Indian system developed by TERI. Each assesses a building against credits across water, energy, materials, waste and indoor air, and awards a level based on the credits achieved.
Treat it as a cost and comfort question rather than a badge. A rating tells you the project pursued credits; it does not tell you which, and the ones that matter to you are specific. Dual plumbing with a working sewage treatment plant, its treated water reused for flushing and landscaping, cuts the society's water bill every month. Shaded west-facing glazing and better glass reduce what you spend on cooling. Rooftop solar on the common supply reduces the maintenance charge. A rainwater system actually connected to a recharge pit, not just a pipe into a tank, affects the borewell.
Ask whether the certification covers the design or the completed building, because some ratings are awarded at design stage. Ask also whether the running cost is budgeted: a treatment plant the association cannot afford to run gets switched off in year three, and you paid for it twice.
How do I negotiate the price?
Negotiation here is less about the headline rate than about everything attached to it. Developers defend the rate per square foot because it sets the benchmark for the rest of the inventory, but they have real flexibility on floor rise, preferential location charges, parking, the clubhouse charge and the first-year maintenance advance. Ask for the itemised sheet and negotiate line by line. A waived floor rise and a free parking slot are usually worth more than a small cut in the base rate, and are given up more readily.
Your leverage comes from three things. Information: what comparable flats in the same micro-market actually transacted at, which registered transaction data tells you and asking prices do not. Timing: quarter ends matter, and so does a tower that is nearly sold out or barely selling. Readiness: a buyer with a loan pre-approved is worth a discount to a sales team carrying a monthly target.
Negotiate the payment schedule as well as the price. A construction-linked plan that genuinely tracks milestones protects you better than one front-loading payments into the first few months. And get every concession written into the allotment letter and then into the agreement. A verbal promise has no value once the salesperson changes jobs.
What happens at booking and at the agreement stage?
Booking is where most of the avoidable damage is done, because it happens fast and under pressure. Before you pay a token, get the unit number, the carpet area, the full itemised price, the payment schedule, the possession date and the refund terms in writing, including what happens to your money if your loan is not sanctioned. A receipt saying booking amount against a project name is not a record of what you bought.
The agreement for sale creates your enforceable rights, and it should be registered. Read it yourself, slowly, and have your lawyer read it. Look hardest at the possession date and what counts as an excuse for missing it, the compensation payable if the developer is late set against the interest you pay if you are late, and whether the flat described matches the carpet area you were shown. Specifications should be a schedule listing brand or grade for flooring, sanitaryware, wiring and fittings, with substitution limited to equivalent quality.
How does registration work?
Registration of a sale deed is compulsory under the Registration Act 1908, and an unregistered sale deed does not transfer title to you. The deed is executed, stamp duty is paid at the rate your state prescribes, the registration fee is paid, and the parties appear before the sub-registrar in whose jurisdiction the property lies, with witnesses and identification. Most states now run an online appointment and valuation system.
Two things catch buyers out. Stamp duty is charged on the higher of the consideration and the state's own guidance or circle rate, so a price below the guidance value does not reduce the duty. And rates, concessions and the registration fee are state matters that change, with several states charging a lower rate where the buyer is a woman. Check the current figure on our stamp duty page and confirm it with the state registration department before you transfer funds. Our registration checklist lists what to carry on the day.
Three deeds get confused. A sale deed transfers ownership of a specific property from seller to buyer and is what you register when you buy. A conveyance deed is the broader category of document conveying an interest in property, and in an apartment project the term usually means the deed by which the developer conveys the land and common areas to the owners' association. The mother deed is the oldest document in the chain of title. Conveyance of the common areas is often left undone for years; ask about it, because it decides who controls the terrace, the basement and the open land.
What should I check at handover and possession?
Do not take the keys and sign the possession letter on the same visit. Ask for a joint inspection first, with someone from the developer's engineering team present, and prepare a written snag list. Measure the carpet area against the figure in the agreement. Count the points and fittings against the specification schedule. Walk the common areas and check that what was promised has been built, not just started.
Then check the paperwork. You want the occupancy certificate, without which the building should not be occupied; the possession letter; the completion certificate where your state issues one; warranties for lifts, pumps and waterproofing; the as-built drawings for the flat's plumbing and electrical runs, which you will want the first time something leaks; and the final no-dues statement. Get the utility connections transferred into your name and confirm the property tax record has been updated.
Ask how the owners' association will be formed and when the developer will hand over the common areas, the corpus fund and the accounts. Under RERA the promoter has obligations on forming the association and on remedying structural defects reported within the statutory period after possession, so note the possession date carefully and report defects in writing rather than by phone.
What mistakes do first-time buyers make?
The same handful, repeatedly. Budgeting against the base price and then finding the real cost is meaningfully higher once duty, GST, parking and the maintenance advance arrive. Comparing two flats on the quoted rate per square foot without working out the loading, and so buying the more expensive one. Paying a token before anyone has read the title. Accepting a brochure or a show flat as the specification, when only the schedule in the agreement binds anybody. Signing an agreement with a soft possession date and a long list of excuses attached.
Two more are quieter and more costly. Stretching the loan to the limit the lender allows, so that a job change or a rate cycle turns a home into a problem. And buying for a projected return in a location you would not live in, which is a long and illiquid mistake.
Keep your own file: every receipt, the allotment letter, the registered agreement, the approval copies, the snag list and the possession letter. Buyers who win RERA complaints are almost always the ones who can produce a dated paper trail. Buyers who lose are often the ones who were told something true, and were told it verbally.
Frequently asked questions
What is the first step in buying a home in India?
Fix the monthly outgo you can service for the long term, then work backwards to a loan amount and add your down payment to get a price ceiling. Set aside money separately for stamp duty, registration, GST where it applies and the charges that sit outside the quoted price. Only then start shortlisting projects.
Is carpet area the same as the area I pay for?
Usually not. RERA requires sale and advertising on carpet area, which Section 2(k) defines as net usable floor area excluding external walls, service shafts, exclusive balcony and exclusive open terrace. Many price sheets still apply the rate per square foot to super built-up area. Divide the total price by the carpet area to get the rate you are really paying.
How do I calculate the loading factor?
Subtract the carpet area from the super built-up area and divide by the carpet area. A flat with 1,000 sq ft carpet sold as 1,450 sq ft carries 45 per cent loading on carpet. Some builders compute loading on built-up area instead, which gives a smaller number for the same flat, so always ask which base is being used.
Should I buy an under-construction or a ready-to-move flat?
Under construction is usually cheaper and lets you pay in stages, but you carry the delay risk and may pay rent and part EMI together. Ready to move costs more and gives you a flat you can inspect, with no construction risk and no GST on a completed unit that holds its occupancy certificate. Choose on how much delay risk you can absorb.
What is an occupancy certificate and why does it matter?
It is issued by the local authority once the completed building has been inspected, and it certifies that the building may lawfully be occupied. It is not a document the builder issues. Taking possession without it leaves you exposed on utilities, on resale and sometimes on the legality of occupation itself.
What is an encumbrance certificate?
A statement from the sub-registrar listing the registered transactions on a property for a stated period, which is how you find a mortgage, a charge or a transfer that was not disclosed. Ask for a long period rather than a short one, and have a lawyer read it alongside the chain of title deeds.
What is the difference between a sale deed, a conveyance deed and a mother deed?
A sale deed transfers ownership of a specific property from seller to buyer and is what you register when you buy. Conveyance deed is the wider term, and in apartment projects it usually means the deed by which the developer conveys the land and common areas to the owners' association. The mother deed is the earliest document in the chain of title that later deeds trace back to.
Is Mivan construction better than conventional RCC?
It is different rather than better. Aluminium formwork casts walls and slab as one concrete shell, which is faster, flatter and has fewer joints for water to enter. But the walls are structural, so later alterations and cutting new chases are restricted or not permitted, and all services must be planned before the pour. Supervision quality matters more than the system.
What is FAR, and how is it different from FSI?
They are two names for the same measure: the permitted built floor area on a plot expressed as a multiple of the plot area. It is set by the local development authority through the master plan and building rules, and it varies by city, zone and road width. Multiply the plot area by the permitted ratio to get a rough ceiling on the project's total built area.
Is green building certification worth paying extra for?
Only if you know which credits were earned. Ask specifically about treated water reused for flushing and landscaping, external wall and glazing performance, solar on the common supply, and a rainwater system connected to a recharge pit. Those reduce your monthly bills. Ask too whether the rating covers the completed building or only the design.
Do I need a lawyer if my bank has already approved the loan?
Yes. The lender's legal opinion is written to protect the lender's security, not your possession, and lenders accept risks that would matter to you. Pay a property lawyer to read the title chain, the encumbrance certificate and the agreement for sale. The fee is small against the purchase price.
What should I get in writing before paying a booking amount?
The unit number, the carpet area, the full itemised price including every charge, the payment schedule, the possession date and the refund terms if your loan is not sanctioned. A receipt naming only the project is not a record of what you bought. Every concession the sales team promises should appear in the allotment letter and then in the registered agreement.
Run your own numbers
PropIQ's calculators are free and need no login: EMI and affordability, stamp duty across states, rent versus buy, rental yield and capital gains.
Open the tools →