Urbanrise Opulence  ·  Nizampet, Hyderabad

You will learn your neighbours’ names.
There are only three of them on your floor.

Opulence is 382 homes on 3.4 acres. That is not a small number of homes.

It is arranged so that four of them share a landing, the gym and the yoga deck sit on the roof instead of the ground, and the trees that were on the site are still on the site. Phase 2 is the second and final phase, on the parcel next door.

acres
towers
floors
homes
sft, 3 BHK
onwards

. The Phase 2 RERA registration number will be published on this page before any booking is accepted.
Prices are current as on and exclude registration, GST and statutory charges.

Opulence, Nizampet — the twelve-storey tower behind the timber-louvred arrival arch Render
The arrival screen at Opulence. Timber louvres, not a boundary wall.

The idea

Most builders answer a small site by building taller.

There is a simpler answer. Put the amenities on the roof.

A clubhouse at ground level eats the ground. A gym, a lounge, a workspace and the parking that serves them will take the better part of an acre before a single tree goes in.

So Opulence moved four of them upstairs. The gym, the zen and yoga deck, the reading lounge and the co-working terrace all sit on the roof slab, where they cost the site nothing.

What is left at ground level is what you would actually want there. Shade, a walking loop, and somewhere for children to be loud.

Two towers, not eight. Twelve floors, not thirty-one. Four homes to a landing.

None of this is a claim about density. Every developer in this city quotes homes per acre, and every one of those numbers is arithmetic done in the quoter's own favour.

This is a claim about what you meet on the way home. How many doors on your floor. How many cars at your gate. How many minutes to the lift at nine in the morning.

You can count all three yourself, on a Sunday, without taking anybody's word for it. We would rather you did.

Towers
Height
Homes to a landing
Amenities on the roof
4Gym, zen & yoga, reading lounge, co-working
Certification
IGBC GoldPre-certified
The co-working terrace on the roof at Opulence Render
The co-working terrace, on the roof slab. Nothing here takes up ground.

The vertical

Read the building the way it was drawn — from the ground up.

Four levels, four different jobs. Choose one.

Render

Master plan

The plan, as a plan — not as a photograph of one.

Hover or tap any zone. Phase 1 is built. Phase 2 is the parcel to its east.

Master plan of Opulence showing Phase 1 to the west and the Phase 2 parcel to the east 1 2 3 4

Indicative only. Zone outlines are drawn for orientation and are not to scale. Refer to the sanctioned plan and the RERA-registered documents for the binding layout.

Homes

Every size. Every price. On this page.

Nothing here is blurred, gated or available on request. If a home does not fit your number, we would rather you found that out now than at a site office on a Sunday.

HomeCarpetFacingPrice

Carpet area as defined under RERA. Prices exclude registration, GST, corpus, maintenance and statutory charges, and are subject to revision.

What it costs a month

estimated monthly instalment on a loan of

Floor plans

Dimensioned plans, not a shaded thumbnail.

Every plan is issued at full dimensions with the room-by-room areas written on it, so you can measure your own furniture against it before you visit. Ask for one and it is sent the same working day.

Plans are issued as sanctioned. Where a plan differs from the sanctioned drawing, the sanctioned drawing governs.

Aerial view of a grade-separated road interchange
Representative image of the Outer Ring Road corridor. Not the project site.

Location

Nizampet, which is quieter than the road that serves it.

The site sits off the Nizampet–Bachupally stretch, close enough to the Outer Ring Road to leave the city quickly and far enough from it to sleep. Below, everything is plotted where it actually lies and how long it actually takes — not listed in a table sorted to flatter.

    Drive times measured off-peak by road and shown for orientation. Traffic in this corridor varies considerably between 8 and 11 in the morning.

    Phase 1

    The best argument for Phase 2 is standing next to it.

    Most launches in this city ask you to believe a render. Phase 2 does not have to. The towers, the arrival screen, the rooftop decks and the tree line are already on the ground a few hundred metres away, and you are welcome to walk through them before you decide anything.

    Book a walk through Phase 1

    The Opulence clubhouse, clad end to end in vertical timber louvres Render
    This is still the drawing. The building it shows is standing at Nizampet — come and look at that instead.
    Tower A at Opulence Phase 1 Render · placeholder
    Towers A and BStructure topped out to level 12. Facade and louvre screens in progress.
    June 2026
    Landscape and tree line at Opulence Phase 1 Render · placeholder
    LandscapePlanting along the southern edge. Play area set into the existing tree line.
    July 2026
    The rooftop deck at Opulence Phase 1 Render · placeholder
    Rooftop decksWaterproofing complete. Pergolas and planters going in.
    August 2026

    These three frames are reserved for dated site photographs. Until they are shot, renders stand in and are marked as such.

    homes delivered and under development by Urbanrise
    square feet built across south India
    IGBC Goldpre-certified, with rooftop solar and rainwater recharge
    homes in Phase 1, across two towers

    Register interest

    Tell us what you are looking for, and we will send you the floor plans.

    No call centre, no automated dialler. One person from the Opulence sales team will call once, within a working day. If you would rather only have the documents, say so below and that is all you will get.

    Or call the site office directly on , 9 am to 7 pm.

    Questions we are actually asked

    Call the site office Register interest